Item List 051247 |
Date:06/01/2018 |
|
RTF Report: CATITEM |
KENTUCKY TRANSPORTATION CABINET
Contract ID | 051247 | Primary Project Number | DE06885680547 |
Contract Description | BLACK OAK ACCESS ROAD; | ||
Primary County | LEWIS | Fed/St Number | FD04 068 8568 |
Vendor ID | 02520 | Vendor Name | ELMO GREER & SONS LLC |
Bid Amount | $ 10,291,024.98 |
SM- Project | DE06885680547 |
Fed/State Number | FD04 068 8568 |
Project Description | BLACK OAK ACCESS ROAD; |
*********** |
SM- Project | DE06885680547 | CATEGORY NUMBER | 0001 | CATEGORY Description | ROADWAY |
PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
0010 | CRUSHED STONE BASE | 00003 | 31,200.700 |
31,200.700 |
$16.000 |
TON | 4.9 |
0020 | TRAFFIC BOUND BASE | 00020 | 400.000 |
400.000 |
$20.000 |
TON | 0.1 |
0030 | ASPHALT SEAL AGGREGATE | 00100 | 142.000 |
142.000 |
$66.500 |
TON | 0.1 |
0040 | CL3 ASPH BASE 1.00D PG64-22 | 00214 | 4,026.800 |
4,026.800 |
$48.000 |
TON | 1.9 |
0050 | CL2 ASPH BASE 0.75D PG64-22 | 00221 | 21,086.000 |
21,086.000 |
$45.000 |
TON | 9.2 |
0060 | EMULSIFIED ASPHALT RS-2 | 00291 | 17.000 |
17.000 |
$320.000 |
TON | 0.1 |
0070 | CL1 ASPH SURF 0.38D PG64-22 | 00300 | 1,261.300 |
1,261.300 |
$56.000 |
TON | 0.7 |
0080 | CL2 ASPH SURF 0.38D PG64-22 | 00301 | 2,563.400 |
2,563.400 |
$52.000 |
TON | 1.3 |
0090 | CL3 ASPH SURF 0.50D PG64-22 | 00312 | 2,106.500 |
2,106.500 |
$53.000 |
TON | 1.1 |
0100 | ASPHALT PLACEMENT WITH MTV | 00338 | 24,748.600 |
24,748.600 |
$2.500 |
TON | 0.6 |
0110 | ENTRANCE PIPE-15 INCH | 00440 | 208.000 |
208.000 |
$32.000 |
LF | 0.1 |
0120 | ENTRANCE PIPE-18 INCH | 00441 | 340.000 |
340.000 |
$36.000 |
LF | 0.1 |
0130 | ENTRANCE PIPE-24 INCH | 00443 | 50.000 |
50.000 |
$45.000 |
LF | 0.0 |
0140 | ENTRANCE PIPE-24 INCH EQUIV | 00452 | 46.000 |
46.000 |
$44.000 |
LF | 0.0 |
0150 | CULVERT PIPE-18 INCH | 00462 | 326.000 |
326.000 |
$47.000 |
LF | 0.1 |
0160 | CULVERT PIPE-24 INCH | 00464 | 112.000 |
112.000 |
$53.000 |
LF | 0.1 |
0170 | CULVERT PIPE-30 INCH | 00466 | 218.000 |
218.000 |
$65.000 |
LF | 0.1 |
0180 | CULVERT PIPE-36 INCH | 00468 | 220.000 |
220.000 |
$81.000 |
LF | 0.2 |
0190 | CULVERT PIPE-42 INCH | 00469 | 544.000 |
544.000 |
$102.000 |
LF | 0.5 |
0200 | CULVERT PIPE-54 INCH | 00471 | 544.000 |
544.000 |
$133.000 |
LF | 0.7 |
0210 | STORM SEWER PIPE-15 INCH | 00521 | 22.000 |
22.000 |
$28.000 |
LF | 0.0 |
0220 | STORM SEWER PIPE-18 INCH | 00522 | 120.000 |
120.000 |
$34.000 |
LF | 0.0 |
0230 | STORM SEWER PIPE-24 INCH | 00524 | 236.000 |
236.000 |
$46.000 |
LF | 0.1 |
0240 | PERFORATED PIPE-4 INCH | 01000 | 528.000 |
978.000 |
$14.000 |
LF | 0.1 |
0250 | NON-PERFORATED PIPE-4 INCH | 01010 | 114.000 |
114.000 |
$15.000 |
LF | 0.0 |
0260 | PERF PIPE HEADWALL TY 1-4 INCH | 01020 | 2.000 |
2.000 |
$400.000 |
EACH | 0.0 |
0270 | PERF PIPE HEADWALL TY 3-4 INCH | 01028 | 5.000 |
5.000 |
$450.000 |
EACH | 0.0 |
0280 | PERF PIPE HEADWALL TY 4-4 INCH | 01032 | 1.000 |
1.000 |
$450.000 |
EACH | 0.0 |
0290 | METAL END SECTION TY 1-15 INCH | 01370 | 10.000 |
10.000 |
$700.000 |
EACH | 0.1 |
0300 | METAL END SECTION TY 1-18 INCH | 01371 | 4.000 |
4.000 |
$1,000.000 |
EACH | 0.0 |
0310 | METAL END SECTION TY 1-24 INCH | 01373 | 4.000 |
4.000 |
$1,400.000 |
EACH | 0.1 |
0320 | METAL END SECTION TY 3-36 INCH | 01395 | 2.000 |
2.000 |
$2,600.000 |
EACH | 0.1 |
0330 | METAL END SECTION TY 3-42 INCH | 01396 | 1.000 |
1.000 |
$3,500.000 |
EACH | 0.0 |
0340 | SLOPED BOX OUTLET TYPE 1-18 IN | 01433 | 2.000 |
2.000 |
$1,500.000 |
EACH | 0.0 |
0350 | SLOPED BOX OUTLET TYPE 1-24 IN | 01434 | 2.000 |
2.000 |
$2,000.000 |
EACH | 0.0 |
0360 | S & F BOX INLET-OUTLET-24 INCH | 01451 | 1.000 |
1.000 |
$3,000.000 |
EACH | 0.0 |
0370 | S & F BOX INLET-OUTLET-30 INCH | 01452 | 2.000 |
2.000 |
$4,300.000 |
EACH | 0.1 |
0380 | S & F BOX INLET-OUTLET-36 INCH | 01453 | 2.000 |
2.000 |
$5,600.000 |
EACH | 0.1 |
0390 | DROP BOX INLET TYPE 1 | 01490 | 3.000 |
3.000 |
$2,200.000 |
EACH | 0.1 |
0400 | DROP BOX INLET TYPE 5F | 01517 | 2.000 |
2.000 |
$2,400.000 |
EACH | 0.0 |
0410 | JUNCTION BOX-24 INCH | 01643 | 1.000 |
1.000 |
$2,200.000 |
EACH | 0.0 |
0420 | BARRICADE-TYPE III | 02014 | 1.000 |
1.000 |
$250.000 |
EACH | 0.0 |
0430 | REMOVE PAVEMENT | 02091 | 67.000 |
67.000 |
$5.000 |
SQYD | 0.0 |
0440 | ROADWAY EXCAVATION | 02200 | 2,309,988.000 |
2,316,975.000 |
$2.520 |
CUYD | 56.6 |
0450 | WATER | 02242 | 1,625.000 |
1,625.000 |
$1.000 |
MGAL | 0.0 |
0460 | FENCE-WOVEN WIRE TYPE 1 | 02262 | 13,003.000 |
13,003.000 |
$4.250 |
LF | 0.5 |
0470 | GUARDRAIL-STEEL W BEAM-S FACE | 02351 | 8,232.000 |
8,232.000 |
$14.850 |
LF | 1.2 |
0480 | GUARDRAIL TERMINAL SECTION NO 1 | 02360 | 2.000 |
2.000 |
$100.000 |
EACH | 0.0 |
0490 | GUARDRAIL END TREATMENT TYPE 2A | 02369 | 6.000 |
6.000 |
$800.000 |
EACH | 0.0 |
0500 | GUARDRAIL END TREATMENT TYPE 3 | 02373 | 2.000 |
2.000 |
$850.000 |
EACH | 0.0 |
0510 | GUARDRAIL END TREATMENT TYPE 4A | 02391 | 2.000 |
2.000 |
$1,900.000 |
EACH | 0.0 |
0520 | R/W MARKER RURAL TYPE 2 | 02435 | 2.000 |
2.000 |
$80.000 |
EACH | 0.0 |
0530 | R/W MARKER MUNICIPAL TYPE 1 | 02437 | 19.000 |
19.000 |
$80.000 |
EACH | 0.0 |
0540 | PLUG WATER WELL | 02475 | 3.000 |
3.000 |
$1,200.000 |
EACH | 0.0 |
0550 | CHANNEL LINING CLASS IA | 02482 | 240.000 |
240.000 |
$120.000 |
TON | 0.3 |
0560 | CHANNEL LINING CLASS II | 02483 | 1,000.000 |
1,000.000 |
$12.520 |
TON | 0.1 |
0570 | CHANNEL LINING CLASS III | 02484 | 1,000.000 |
1,000.000 |
$14.750 |
TON | 0.1 |
0580 | CHANNEL LINING CLASS IV | 02488 | 1,660.000 |
1,660.000 |
$10.000 |
CUYD | 0.2 |
0590 | CLEARING AND GRUBBING 70.8 ACRES | 02545 | 1.000 |
1.000 |
$197,000.000 |
LS | 1.9 |
0600 | SIGNS | 02562 | 444.750 |
444.750 |
$10.000 |
SQFT | 0.0 |
0610 | EDGE KEY | 02585 | 170.000 |
170.000 |
$37.000 |
LF | 0.1 |
0620 | FABRIC-GEOTEXTILE TYPE III | 02598 | 7,057.000 |
7,057.000 |
$2.000 |
SQYD | 0.1 |
0630 | FABRIC-GEOTEXTILE TYPE IV | 02599 | 50,257.000 |
50,257.000 |
$2.000 |
SQYD | 1.0 |
0640 | MAINTAIN & CONTROL TRAFFIC | 02650 | 1.000 |
1.000 |
$30,000.000 |
LS | 0.3 |
0650 | SETTLEMENT PLATFORM | 02692 | 1.000 |
1.000 |
$2,000.000 |
EACH | 0.0 |
0660 | TEMPORARY SILT FENCE | 02701 | 600.000 |
600.000 |
$10.000 |
LF | 0.1 |
0670 | SILT TRAP TYPE A | 02703 | 30.000 |
50.000 |
$400.000 |
EACH | 0.1 |
0680 | SILT TRAP TYPE B | 02704 | 139.000 |
139.000 |
$200.000 |
EACH | 0.3 |
0690 | CLEAN SILT TRAP TYPE A | 02706 | 60.000 |
60.000 |
$100.000 |
EACH | 0.1 |
0700 | CLEAN SILT TRAP TYPE B | 02707 | 278.000 |
278.000 |
$100.000 |
EACH | 0.3 |
0710 | CLEAN TEMPORARY SILT FENCE | 02709 | 2,400.000 |
2,400.000 |
$0.500 |
LF | 0.0 |
0720 | STAKING | 02726 | 1.000 |
1.000 |
$99,000.000 |
LS | 1.0 |
0730 | FLASHING ARROW | 02775 | 4.000 |
4.000 |
$3,000.000 |
EACH | 0.1 |
0740 | STEEL PIPE-2 1/2 INCH | 03340 | 84.000 |
84.000 |
$100.000 |
LF | 0.1 |
0750 | STEEL PIPE-4 INCH | 03343 | 82.750 |
82.750 |
$125.000 |
LF | 0.1 |
0760 | EROSION CONTROL BLANKET | 05950 | 3,312.000 |
3,312.000 |
$1.200 |
SQYD | 0.0 |
0770 | TOPDRESSING FERTILIZER | 05966 | 7.000 |
7.000 |
$450.000 |
TON | 0.0 |
0780 | SEEDING AND PROTECTION | 05985 | 40,804.000 |
252,804.000 |
$0.380 |
SQYD | 0.2 |
0790 | SPECIAL SEEDING CROWN VETCH | 05989 | 246,402.000 |
246,402.000 |
$0.280 |
SQYD | 0.7 |
0800 | SODDING | 05990 | 20,390.000 |
20,390.000 |
$4.250 |
SQYD | 0.8 |
0810 | PAVE STRIPING-TEMP PAINT-4 IN | 06510 | 39,589.000 |
39,589.000 |
$0.300 |
LF | 0.1 |
0820 | PAVE STRIPING-PERM PAINT-4 IN | 06514 | 61,304.000 |
61,304.000 |
$0.300 |
LF | 0.2 |
0830 | PAVE STRIPING-TEMP REM TAPE-W | 06550 | 6,800.000 |
6,800.000 |
$2.250 |
LF | 0.1 |
0840 | PAVE STRIPING-TEMP REM TAPE-Y | 06551 | 6,800.000 |
6,800.000 |
$2.250 |
LF | 0.1 |
0850 | PAVE MARKING-PAINT CROSS-HATCH | 06570 | 1,782.000 |
1,782.000 |
$1.750 |
SQFT | 0.0 |
0860 | PAVEMENT MARKER TYPE V-MW | 06589 | 66.000 |
66.000 |
$32.500 |
EACH | 0.0 |
0870 | PAVEMENT MARKER TYPE V-BY | 06591 | 120.000 |
120.000 |
$32.500 |
EACH | 0.0 |
0880 | CONCRETE-CLASS A | 08100 | 24.670 |
24.670 |
$875.000 |
CUYD | 0.2 |
0890 | STEEL REINFORCEMENT | 08150 | 1,749.000 |
1,749.000 |
$2.000 |
LB | 0.0 |
0900 | INSTALL PROJECT IDENTIFICATION SIGNS | 20588NC | 2.000 |
2.000 |
$150.000 |
EACH | 0.0 |
0910 | PAVE STRIPING TEMP N/R TAPE-B | 21366ES831 | 36,434.000 |
36,434.000 |
$1.500 |
LF | 0.5 |
0920 | CAP LATERAL LINE | 21367ND | 1.000 |
1.000 |
$500.000 |
LS | 0.0 |
8001 | EROSION CONTROL BLANKET Cut | 05950 | 0.000 |
44,000.000 |
$1.590 |
SQYD | 0.0 |
8003 | EW~ COMPOST | 10090NX | 0.000 |
1.000 |
$54,726.000 |
LS | 0.0 |
8004 | PAVE MARK-PAINT ARROWS Temp | 20208EC | 0.000 |
14.000 |
$52.500 |
EACH | 0.0 |
8005 | PAVE MARK TEMP PAINT STOP BAR | 20099ES842 | 0.000 |
97.000 |
$3.000 |
LF | 0.0 |
8006 | PAVE MARKING-PAINT CROSS-HATCH | 06570 | 0.000 |
315.000 |
$1.950 |
SQFT | 0.0 |
8007 | PAVE STRIPING-TEMP PAINT-6 IN | 06511 | 0.000 |
286.000 |
$0.500 |
LF | 0.0 |
8008 | PAVE MARKING-PRE THERM CURV ARROW | 06574 | 0.000 |
33.000 |
$93.500 |
EACH | 0.0 |
8009 | PAVE MARKING-PRE THERM COMB ARROW | 06575 | 0.000 |
3.000 |
$126.500 |
EACH | 0.0 |
8010 | PAVE MARKING-PAINT WORDS | 06601NC | 0.000 |
15.000 |
$181.500 |
EACH | 0.0 |
8011 | PAVE MARKING-THERMO STOP BAR-24IN | 06568 | 0.000 |
225.000 |
$7.150 |
LF | 0.0 |
8012 | FUEL ADJUSTMENT | 10020NS | 0.000 |
142,792.760 |
$1.000 |
DOLL | 0.0 |
8013 | ASPHALT ADJUSTMENT | 10030NS | 0.000 |
109,959.770 |
$1.000 |
DOLL | 0.0 |
8014 | RIDE QUALITY ADJUSTMENT ASPH | 10005NS | 0.000 |
906.050 |
$1.000 |
DOLL | 0.0 |
8015 | LOT PAY ADJUSTMENT | 10000NS | 0.000 |
26,671.320 |
$1.000 |
DOLL | 0.0 |
8016 | COST PLUS WORK | 10080NS | 0.000 |
1.000 |
$41,445.040 |
LS | 0.0 |
8017 | COST PLUS WORK Drainage | 10080NSD | 0.000 |
75,000.000 |
$1.000 |
DOLL | 0.0 |
Category Total $9,325,901.79 |
SM- Project | DE06885680547 | CATEGORY NUMBER | 0002 | CATEGORY Description | STREAM MITIGATION |
PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
0930 | DRAINAGE BLANKET-EMBANKMENT | 00021 | 6,199.000 |
6,199.000 |
$18.000 |
CUYD | 1.1 |
0940 | TEMPORARY DITCH | 02159 | 6,179.000 |
6,179.000 |
$0.500 |
LF | 0.0 |
0950 | GRANULAR EMBANKMENT | 02223 | 3,682.000 |
3,682.000 |
$22.000 |
CUYD | 0.8 |
0960 | FABRIC-GEOTEXTILE TYPE I | 02596 | 611.000 |
611.000 |
$2.000 |
SQYD | 0.0 |
0970 | RIFFLE STRUCTURE-DUMPED STONE | 02738 | 9.000 |
9.000 |
$600.000 |
EACH | 0.1 |
0980 | EROSION CONTROL BLANKET | 05950 | 17,260.000 |
17,260.000 |
$2.100 |
SQYD | 0.4 |
0990 | TEMPORARY MULCH | 05952 | 342,672.000 |
342,672.000 |
$0.160 |
SQYD | 0.5 |
1000 | CHANNEL CHANGE SEEDING | 05982 | 17,870.000 |
17,870.000 |
$0.840 |
SQYD | 0.1 |
1010 | STAGHORN SUMAC | 07534 | 673.000 |
673.000 |
$9.000 |
EACH | 0.1 |
1020 | RED OAK | 20005ES724 | 338.000 |
338.000 |
$9.000 |
EACH | 0.0 |
1030 | AMERICAN SYCAMORE | 20050ES724 | 338.000 |
338.000 |
$9.000 |
EACH | 0.0 |
1040 | STEP POOL | 20232MD | 57.000 |
57.000 |
$125.000 |
EACH | 0.1 |
1050 | GREEN ASH | 20235MS724 | 338.000 |
338.000 |
$9.000 |
EACH | 0.0 |
1060 | SILKY DOGWOOD | 20237MS724 | 507.000 |
507.000 |
$9.000 |
EACH | 0.0 |
1070 | SILT TRAP TYPE C | 20496NS843 | 70.000 |
70.000 |
$125.000 |
EACH | 0.1 |
1080 | CLEAN SILT TRAP TYPE C | 20497NS843 | 140.000 |
140.000 |
$60.000 |
EACH | 0.1 |
1090 | BUR OAK | 20921NS724 | 337.000 |
337.000 |
$9.000 |
EACH | 0.0 |
1100 | SILKY WILLOW | 21021ES724 | 915.000 |
915.000 |
$9.000 |
EACH | 0.1 |
1110 | SCARLET OAK | 21368NS724 | 337.000 |
337.000 |
$9.000 |
EACH | 0.0 |
1120 | CHOKECHERRY | 21369NS724 | 508.000 |
508.000 |
$9.000 |
EACH | 0.0 |
1130 | LONGITUDINAL SAW CUT- 6 IN | 21370ED | 6,812.000 |
6,812.000 |
$2.000 |
LF | 0.1 |
8002 | EW~ Mitigation Elimination | 10090NX | 0.000 |
1.000 |
$12,600.000 |
LS | 0.0 |
Category Total $384,899.82 |
SM- Project | DE06885680547 | CATEGORY NUMBER | 0003 | CATEGORY Description | WATERLINE |
PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
1140 | STEEL ENCASEMENT PIPE-14 INCH | 01071 | 257.000 |
257.000 |
$170.000 |
LF | 0.4 |
1150 | PVC PIPE-4 INCH | 03383 | 20.000 |
20.000 |
$30.000 |
LF | 0.0 |
1160 | PVC PIPE-8 INCH | 03387 | 740.000 |
740.000 |
$30.000 |
LF | 0.2 |
1170 | TIE-IN 8 INCH | 03468 | 2.000 |
2.000 |
$1,500.000 |
EACH | 0.0 |
1180 | GATE VALVE-4 INCH | 03524 | 1.000 |
1.000 |
$600.000 |
EACH | 0.0 |
1190 | GATE VALVE-8 INCH | 03528 | 2.000 |
2.000 |
$1,000.000 |
EACH | 0.0 |
Category Total $72,090.00 |
SM- Project | DE06885680547 | CATEGORY NUMBER | 0004 | CATEGORY Description | MOBILIZATION & DEMOBILIZATION |
PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
1200 | MOBILIZATION | 02568 | 1.000 |
1.000 |
$361,000.000 |
LS | 3.5 |
1210 | DEMOBILIZATION | 02569 | 1.000 |
1.000 |
$147,133.370 |
LS | 1.4 |
8018 | LIQUIDATED DAMAGES-FULL RATE | 10010NS | 0.000 |
1.000 |
$4,000.000 |
DAY | 0.0 |
8019 | LIQUIDATED DAMAGES-HALF RATE | 10012NS | 0.000 |
-2.000 |
$2,000.000 |
DAY | 0.0 |
Category Total $508,133.37 |